• Donnerstag, 28 März 2024
  • 10:08 Uhr Frankfurt
  • 09:08 Uhr London
  • 05:08 Uhr New York
  • 05:08 Uhr Toronto
  • 02:08 Uhr Vancouver
  • 20:08 Uhr Sydney

Victoria Gold: Eagle Gold Mine Q1 2022 Operational Highlights

07.04.2022  |  GlobeNewswire

WHITEHORSE, April 07, 2022 - Victoria Gold Corp. (TSX-VGCX) ("Victoria" or the "Company") produced 24,358 ounces of gold during the first quarter of 2022.

Mr. John McConnell, President and CEO commented, "During the first quarter, we successfully completed a six-week winter maintenance program and resumed stacking ore on the heap leach pad. As we head into spring, stacking rates will significantly increase along with gold production as fresh ore is placed under irrigation."

Eagle Gold Mine First Quarter 2022 Operational Highlights

The Company's seasonal operations plan for 2022 included curtailment of ore stacking on the heap leach pad during the 90 coldest days of the year, January through March. During this time a six-week maintenance program on the crushing and stacking facilities was completed. Periods of exceptionally cold weather this year impacted Q1 operations.

Eagle Gold Mine Q1 2022 Operational Highlights:

2021 2022
Q1 Q2
Ore mined millions of tonnes 1.6 1.3
Waste mined millions of tonnes 4.7 2.3
Total mined millions of tonnes 6.2 3.6
Strip Ratio (waste to ore) 2.9 1.7
Mining rate 000's of tonnes/day 69 39
Ore stacked on pad millions of tonnes 0.9 0.9
Ore stacked grade grams/tonne Au 0.87 0.72
Gold produced ounces 26,759 24,358

Q1 statistics may be subject to immaterial reconciliation variances.

Gold production in Q1 2022 was, as expected, seasonally low with limited ore stacking on the heap leach pad. Tonnes stacked on the heap leach pad in Q1 2022 were in line with Q1 2021. Total tonnes mined were lower in Q1 2022 compared to the same period last year as the Company has built up sufficient stockpiles throughout 2021, therefore further mining of ore was not advantageous. Similarly, waste mined was lower; a reflection of the fact there was less waste to move in Q1 2022 compared to Q1 2021. Mining rates will increase in future quarters as ore stacking rates on the heap leach pad accelerate.

Both gold grade and metallurgical recovery continue to reconcile well against the Eagle reserve model.

Qualified Person
The technical content of this news release has been reviewed and approved by Paul D. Gray, P.Geo., as the "Qualified Person" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About the Dublin Gulch Property
Victoria Gold's 100%-owned Dublin Gulch gold property (the "Property") is situated in central Yukon Territory, Canada, approximately 375 kilometers north of the capital city of Whitehorse, and approximately 85 kilometers from the town of Mayo. The Property is accessible by road year round, and is located within Yukon Energy's electrical grid.

The Property covers an area of approximately 555 square kilometers, and is the site of the Company's Eagle and Olive Gold Deposits. The Eagle Gold Mine is Yukon's newest operating gold mine. The Eagle and Olive deposits include Proven and Probable Reserves of 3.3 million ounces of gold from 155 million tonnes of ore with a grade of 0.65 grams of gold per tonne, as outlined in a National Instrument 43-101 Technical Report for the Eagle Gold Mine dated December 3, 2019. The Mineral Resource under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") for the Eagle and Olive deposits has been estimated to host 227 million tonnes averaging 0.67 grams of gold per tonne, containing 4.7 million ounces of gold in the "Measured and Indicated" category, inclusive of Proven and Probable Reserves, and a further 28 million tonnes averaging 0.65 grams of gold per tonne, containing 0.6 million ounces of gold in the "Inferred" category.

Cautionary Language and Forward-Looking Statements
This press release includes certain statements that may be deemed "forward-looking statements". Except for statements of historical fact relating to Victoria, information contained herein constitutes forward-looking information, including any information related to Victoria's strategy, plans or future financial or operating performance. Forward-looking information is characterized by words such as "plan", "expect", "budget", "target", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may", "will", "could" or "should" occur, and includes any guidance and forecasts set out herein (including, but not limited to, production and operational guidance of the Corporation). In order to give such forward-looking information, the Corporation has made certain assumptions about the its business, operations, the economy and the mineral exploration industry in general, in particular in light of the impact of the novel coronavirus and the COVID-19 disease ("COVID-19") on each of the foregoing. In this respect, the Corporation has assumed that production levels will remain consistent with management's expectations, contracted parties provide goods and services on agreed timeframes, equipment works as anticipated, required regulatory approvals are received, no unusual geological or technical problems occur, no material adverse change in the price of gold occurs and no significant events occur outside of the Corporation's normal course of business. Forward-looking information is based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made, and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those described in, or implied by, the forward-looking information. These factors include the impact of general business and economic conditions, risks related to COVID-19 on the Company, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, anticipated metal production, fluctuating metal prices, currency exchange rates, estimated ore grades, possible variations in ore grade or recovery rates, changes in accounting policies, changes in Victoria's corporate resources, changes in project parameters as plans continue to be refined, changes in development and production time frames, the possibility of cost overruns or unanticipated costs and expenses, uncertainty of mineral reserve and mineral resource estimates, higher prices for fuel, steel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, final pricing for metal sales, unanticipated results of future studies, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, requirements for additional capital, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcomes of pending litigation and labour disputes, risks related to remote operations and the availability of adequate infrastructure, fluctuations in price and availability of energy and other inputs necessary for mining operations. Although Victoria has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in, or implied by, the forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The reader is cautioned not to place undue reliance on forward-looking information. The forward-looking information contained herein is presented for the purpose of assisting investors in understanding Victoria's expected financial and operational performance and Victoria's plans and objectives and may not be appropriate for other purposes. All forward-looking information contained herein is given as of the date hereof, as the case may be, and is based upon the opinions and estimates of management and information available to management of the Corporation as at the date hereof. The Corporation undertakes no obligation to update or revise the forward-looking information contained herein and the documents incorporated by reference herein, whether as a result of new information, future events or otherwise, except as required by applicable laws.

For Further Information Contact:
John McConnell
President & CEO
Victoria Gold Corp.
Tel: 604-696-6605
ceo@vgcx.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Victoria Gold Corp.
Bergbau
A2PVRH
CA92625W5072

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.