Minenportal.de - Rohstoffe von Bergbauunternehmen und Minengesellschaften aus aller Welt

New Drill Results Extend Strike Length of the High Grade Northwest Dyke to 500 Metres at Grid Metals Donner Lake Lithium Property

26.04.2022  |  ACCESS Newswire

Property Acquisitions Announced

TORONTO, April 26, 2022 - Grid Metals Corp. (the "Company") (TSXV:GRDM)(OTCQB:MSMGF) is pleased to report additional diamond drill results from the 2022 lithium exploration program at its Donner Lake lithium property in southeastern Manitoba. The project is located in the Winnipeg River pegmatite field, which hosts the world-class Tanco pegmatite and the associated Tanco lithium-cesium-tantalum mine and concentrator. The Donner Lake Lithium project is a 75%/25% joint venture between Grid Metals Corp. and Lithium Royalty Corp., a leading player in global lithium finance.

Highlights of todays announcement are as follows:

Above: 2022 drill hole locations for the Northwest Dyke at the Donner Lake Lithium Property showing the current surface projection of the main pegmatite body (thick pink line) and the Li2O grades obtained for holes GDL22-01 to 03 and GDL22-12 and 13.

Above: Close up of elongate, white spodumene crystals in GLD22-14, drilled from the same setup as hole GDL22-13 reported on here. NQ core size.

Program Details

Complete results for the drill holes reported today from the 2022 Northwest Dyke exploration drill program together with drill hole specifications are provided in the Appendices accompanying this release.

Mr. Carey Galeschuk, Grid's Vice President, Lithium Exploration, stated: "The new drill results demonstrate good continuity - both vertically and along strike, in the Northwest Dyke. The Company now has two vertically-oriented, lithium-rich pegmatite dykes (Main and Northwest dykes) to build an initial resource from and we are optimistic about the prospect of discovering additional, LCT-type pegmatite dykes at Donner Lake as we prepare for the start of a property-wide field exploration program later this spring. The excellent location of the Donner Lake property - located nearby Canada's only currently operating spodumene concentrator at Tanco and in the world-class Winnipeg River pegmatite field, is a tremendous foundation on which to build a significant new lithium resource in a Tier 1 mining jurisdiction."

About the Donner Lake Lithium Property

Acquisition of New Properties

The Company is pleased to announce that it has entered into two property options in the Bernie Lake pegmatite field in the south part of the Bird River Greenstone Belt near the Tanco Mine. The properties are prospective for lithium bearing pegmatites. There are two option agreements that have been entered into with the vendor who is arms length to the Company. The transactions are subject to the final approval of TSX Venture Exchange.

The Bird Property consists of two mining claims and the Bridge Property also consists of two mining claims. The properties are not contiguous The Bridge Property has documented lithium bearing pegmatites on the property while in the case of the Bird Claims the property is in close proximity to a to a documented geochemical lithium anomaly.

Terms

A 100% interest can be earned in the Bird Property by Grid making a $5,000 payment on closing along with the issuance of 100,000 common shares of the Company. Subsequent payments required to earn a 100% interest in the property are $10,000 and 200,000 shares before January 10, 2023 and $35,000 and 200,000 shares before January 10, 2024.

A 100% interest can be earned in the Bridge Property by Grid making a $5,000 payment on closing along with issuing 100,000 common shares of the Company. Subsequent payments required to earn a 100% interest in the property at $10,000 and 200,000 shares before January 10, 2023 and $35,000 and 200,000 shares before January 10, 2024.

In the case of both option agreements the vendor will retain a 2% royalty from future production. Grid shall have the right to purchase 1% of the royalty on each property for $1 million.

Quality Assurance and Quality Control

Grid Metals applies best practice quality assurance and quality control ("QAQC") protocols on all of its exploration programs. For the Donner Lake drilling program, core was logged and sampled at the Company's core facility located on the Makwa Property. Generally, 1.0 metre sample lengths were used. Samples were bagged and tagged and then transported by secure carrier to the Actlabs (Thunder Bay) laboratory for sample preparation and analysis for lithium, cesium, tantalum and selected major and trace element abundances using a sodium peroxide fusion total digestion method followed by ICP-OES and ICP-MS analysis. The Company is using two lithium + rare metal certified reference materials ("CRMs") and two analytical blanks for the Donner Lake program to monitor analytical accuracy and check for cross contamination between samples.

Above: Location of Donner Lake Lithium Project - 180 km northeast of Winnipeg, Manitoba, Canada.

Above: Area of the Northwest (NW) and Main Dykes at the Donner Lake Lithium Property.

Above: Currently known LCT-type pegmatite dykes at the Donner Lake Lithium Property.

Dave Peck, P.Geo., has reviewed the contents of this press release and is the qualified person for purposes of National Instrument 43-101.

About Grid Metals Corp.

Grid Metals Corp. has a portfolio of exploration and development stage properties focused on battery metals (nickel, copper, platinum group metals, cobalt, palladium) which are located in the Provinces of Manitoba and Ontario, Canada. The Company recently completed winter exploration drilling Company's Makwa nickel property which is part of the PEA stage Makwa Mayville Ni-Cu-PGM property which is also located in the Bird River Greenstone Belt.

To find out more about Grid Metals Corp., please visit www.gridmetalscorp.com.

On Behalf of the Board of Grid Metals Corp.
Robin Dunbar - President, CEO & Director
Telephone: 647 201 6844 Email: rd@gridmetalscorp.com
David Black - Investor Relations Email: info@gridmetalscorp.com 416 955-4773

Appendix 1: Analytical Results, Drill Hole GDL22-03, Northwest Pegmatite Dyke, Donner Lake Lithium Property, Southeastern Manitoba.

Sample#

From (m)

To (m)

Length (m)

Li2O (%)

Ta (ppm)

Cs (ppm)

Rb2O (%)

752506

160.92

162.00

1.08

1.19

97

188

0.36

752508

162.00

163.00

1.00

1.75

90

195

0.35

752509

163.00

164.00

1.00

1.96

56

131

0.26

752511

164.00

165.05

1.05

1.62

52

154

0.28

752513

165.05

165.95

0.90

0.20

77

130

0.27

Li-rich

160.92

165.05

4.13

1.62

74

167

0.31

Section

Appendix 2: Analytical Results, Drill Hole GDL22-12, Northwest Pegmatite Dyke, Donner Lake Lithium Property, Southeastern Manitoba.

Sample#

From (m)

To (m)

Length (m)

Li2O (%)

Ta (ppm)

Cs (ppm)

Rb2O (%)

752734

218.30

218.80

0.50

0.24

1

81

0.03

752736

218.80

219.56

0.76

0.53

236

355

0.33

752737

219.56

220.65

1.09

1.48

176

225

0.34

752738

220.65

221.65

1.00

1.83

71

228

0.42

752739

221.65

222.65

1.00

1.39

129

214

0.30

752741

222.65

223.39

0.74

1.87

56

210

0.29

752742

223.39

223.78

0.39

0.32

70

191

0.29

752743

223.78

224.80

1.02

1.40

77

310

0.32

752745

224.80

225.45

0.65

1.51

71

374

0.34

752746

225.45

226.45

1.00

0.86

74

326

0.34

752747

226.45

227.35

0.90

0.43

83

324

0.36

752748

227.35

228.00

0.65

0.23

88

215

0.34

752749

228.00

228.97

0.97

0.15

66

113

0.31

Li-rich

219.56

225.45

5.89

1.48

99

251

0.33

Section

Appendix 3: Analytical Results, Drill Hole GDL22-13, Northwest Pegmatite Dyke, Donner Lake Lithium Property, Southeastern Manitoba.

Sample#

From (m)

To (m)

Length (m)

Li2O (%)

Ta (ppm)

Cs (ppm)

Rb2O (%)

752757

135.20

135.82

0.62

0.08

73.3

106

0.26

752763

138.42

139.48

1.06

0.14

78.4

128

0.28

752764

139.48

140.22

0.74

1.09

46.1

182

0.34

752766

140.22

141.20

0.98

1.62

55.4

164

0.30

752767

141.20

142.20

1.00

1.74

54.4

121

0.22

752768

142.20

142.90

0.70

0.33

53.7

148

0.40

752769

142.90

143.45

0.55

0.13

75.3

116

0.30

752771

143.45

143.82

0.37

0.22

44.8

53.7

0.15

Li-rich

139.48

142.20

2.72

1.52

53

153

0.28

Section

"The true thickness of the lithium intersections in holes GDL22-01, 02, 03, 12 and 13 are estimated to range from 50% to 70% of the interval lengths."

Appendix 4: Specifications for the drill holes GLD22-03, GLD22-012 and GLD22- 013 reported in this news release along with previously released GLD22-01 and 02, Northwest Pegmatite Dyke, Donner Lake Lithium Property, Southeastern Manitoba. Easting and northing coordinates are based on a NAD83 UTM Zone 15 projection.

Hole ID

Easting

(m)

Northing (m)

Elevation (m)

Azimuth

Dip

Depth (m)

Length (m)

GDL-22-01

315954

5610632

290

135°

-60°

131

15.80

GDL-22-02

315954

5610632

290

135°

-45°

215

9.40

GDL22-03

315960

5610735

299

135°

-45°

179

5.50

GDL-22-12

315754

5610459

297

100°

-60°

250

10.13

GDL-22-13

316175

5610670

295

315°

-45°

179

5.41

SOURCE: Grid Metals Corp.



View source version on accesswire.com:
https://www.accesswire.com/698839/New-Drill-Results-Extend-Strike-Length-of-the-High-Grade-Northwest-Dyke-to-500-Metres-at-Grid-Metals-Donner-Lake-Lithium-Property