Minenportal.de - Rohstoffe von Bergbauunternehmen und Minengesellschaften aus aller Welt

Pacific Ridge Plans 7,000 Metre Drill Program at Kliyul Copper-Gold Project

25.05.2023  |  Newsfile

Vancouver, May 25, 2023 - Pacific Ridge Exploration Ltd. (TSXV: PEX) (OTCQB: PEXZF) ("Pacific Ridge" or the "Company") is pleased to announce the Company's 2023 exploration plans for its 100% owned Kliyul copper-gold porphyry project ("Kliyul"), located in the prolific Quesnel Trough in northcentral British Columbia (see Figure 1). The exploration program will have two main objectives, 1) to expand the size of the Kliyul Main Zone ("KMZ") mineralized body to the southeast and into neighbouring fault blocks (see Figure 2), and, 2) testing several high priority targets that occur along the Divide Lake Fault Trend, a highly-prospective 6-km-long alteration and mineralization corridor (see Figure 3).

"I have high expectations for this year's drill program at Kliyul," said Blaine Monaghan, President & CEO of Pacific Ridge. "Our technical team, Executive Chairman Dr. Gerry Carlson, Vice President of Exploration Danette Schwab, and Chief Geologist Paul Jago, have done a fantastic job further developing our knowledge and understanding of Kliyul, which will be the key to unlocking its tremendous potential. I believe that the results from this year's drill program will be an inflection point for the Company."

Pacific Ridge will utilize two diamond drill rigs and plans to drill a minimum of 7,000 m expanding the size of the KMZ mineralized body and testing other targets. The program is fully funded, budgeted at $4.6 million, and the Company expects drilling to be underway by the end of June.

Figure 1: Location of Kliyul

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5460/167413_d9e9b4ef840c7af7_001full.jpg

Figure 2: Plan View of KMZ, Kliyul West, Kliyul North and East Wedge with magnetic vector inversion (MVI) amplitude magnetics

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5460/167413_6a345223c4ca58e0_002full.jpg

Figure 3: Other targets at Kliyul: Ginger, Parish Hill, Bap Ridge, and M39

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5460/167413_d9e9b4ef840c7af7_003full.jpg

Recap of the 2022 Exploration Program at Kliyul

Pacific Ridge's 2022 exploration program consisted of diamond drilling (7,014.7 m in 12 drill holes), Induced Polarization (IP) survey (27 line-km), high-resolution heli-borne magnetic and radiometric survey (423 line-km), MVI modelling of aeromagnetic survey results, LiDAR survey (257.5 line-km), porphyry footprints geochemical modelling, geological mapping and surface sampling (rock), and continued baseline water sampling.

Key accomplishments of the 2022 exploration program include the following:

See Table 1 for 2021 and 2022 drilling highlights.

2023 Drill Hole Planning

The planned 2023 drilling program at Kliyul will total 7,000 m in at least 12 drill holes.

KMZ Drill Holes

A minimum of seven drill holes (over 4,000 m) are planned to expand the size of the KMZ mineralized body into neighbouring fault blocks Kliyul West, Kliyul North, and East Wedge (Figure 2).

Other targets

A minimum of four drill holes (over 2,300 m) is planned to test four satellite target areas of interest along the prospective 6-km-long Divide Lake Fault trend from the Ginger target in the northwest to the M-39 target in the southeast (Figure 4). This northwest trending corridor includes KMZ where it intersects the ENE-trending Valley Fault zone.

Figure 4: Target Zone Locations at Kliyul with RMI Aeromagnetics

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5460/167413_d9e9b4ef840c7af7_004full.jpg

About Kliyul

Owned 100% by Pacific Ridge, Kliyul is over 60 km2 in size and is located in the prolific Quesnel Trough close to existing infrastructure. Kliyul comprises nine porphyry copper-gold targets along two main trends: the 1.5 km-long east-northeast Valley Fault Trend, which includes its five fault-defined target areas (Kliyul West, KMZ, Kliyul North, East Wedge, and Kliyul East); and the 6-km-long northwest-trending Divide Lake Fault Trend which includes Ginger, Parish Hill, Bap Ridge, and M-39 target areas.

Since 2020, Pacific Ridge has spent over $7.5M advancing Kliyul, including 8,557 m of drilling in 15 holes as well as geological, geochemical and geophysical surveys. Based on the exploration results to date, the Company believes that there is excellent potential to define a significant porphyry copper-gold system with multiple centres. Drilling at KMZ to date has defined a mineralized body measuring approximately 600 m by 350 m, and to a depth of 600 m; and geophysical data, including recent magnetic and IP surveys, suggest that this body can be expanded significantly.

Table 1: 2021 and 2022 Kliyul Drill Highlights

Hole From(m) To(m) Width(m) Cu(%) Au(g/t) Ag(g/t) CuEq(%)* AuEq(g/t)**
KLI-21-036 12.0 449.0 437.0 0.22 0.60 1.62 0.68 0.93
Includes 12.0 65.0 53.0 0.22 0.83 1.52 0.84 1.15
And 12.0 33.0 21.0 0.34 1.30 2.48 1.31 1.80
And 47.0 65.0 18.0 0.22 0.89 1.24 0.88 1.21
Includes 143.3 435.0 291.7 0.28 0.74 2.04 0.84 1.15
And 294.0 435.0 141.0 0.36 1.11 2.76 1.19 1.64
KLI21-037 12.3 579.0 566.7 0.20 0.44 1.39 0.53 0.73
Includes 12.3 329.0 316.7 0.30 0.70 2.17 0.83 1.14
And 62.0 73.0 11.0 0.42 1.22 4.48 1.35 1.85
And 90.0 122.0 32.0 0.52 0.88 2.48 1.18 1.62
And 146.0 161.0 15.0 0.39 1.19 2.86 1.29 1.77
Includes 238.8 288.1 49.4 0.66 1.50 4.83 1.79 2.46
And 243.9 268.0 24.1 1.09 2.21 7.92 2.77 3.80
KLI21-038 9.0 516.0 507.0 0.15 0.39 1.51 0.45 0.62
Includes 9.0 351.0 342.0 0.17 0.50 2.00 0.56 0.77
And 9.0 43.0 34.0 0.27 0.72 2.84 0.82 1.13
And 9.0 63.0 54.0 0.21 0.56 2.27 0.64 0.88
And 108.0 136.0 28.0 0.21 0.60 9.01 0.72 0.99
And 153.1 186.0 32.9 0.24 0.78 1.68 0.82 1.12
And 226.0 351.0 125.0 0.23 0.69 1.57 0.74 1.02
And 261.0 349.0 88.0 0.26 0.84 1.82 0.89 1.22
KLI-22-039 9.3 252.0 242.7 0.15 0.17 1.05 0.29 0.39
Includes 22.0 43.4 21.4 0.38 0.48 3.96 0.76 1.04
And 192.0 229.0 37.0 0.20 0.27 0.67 0.40 0.55
KLI-22-040 23.0 550.8 527.8 0.19 0.30 1.35 0.42 0.58
Includes 89.0 355.5 266.5 0.23 0.48 1.94 0.60 0.82
And 170.0 268.0 98.0 0.33 0.90 3.42 1.01 1.39
And 210.0 253.0 43.0 0.50 1.11 2.72 1.33 1.83
And 306.6 340.0 33.4 0.09 0.56 0.77 0.50 0.69
KLI-22-041 12.0 600.0 588.0 0.12 0.39 0.90 0.41 0.56
Includes 106.0 442.0 336.0 0.15 0.62 1.04 0.61 0.84
And 164.0 442.0 278.0 0.14 0.72 0.95 0.67 0.92
And 164.0 200.0 36.0 0.30 0.70 1.61 0.82 1.13
And 280.0 323.0 43.0 0.09 1.59 1.34 1.26 1.73
And 337.0 398.0 61.0 0.25 1.15 1.12 1.09 1.50
And 420.0 442.0 22.0 0.10 0.63 1.01 0.56 0.77
KLI-22-042 9.0 702.0 693.0 0.11 0.20 0.81 0.26 0.36
Includes 136.0 474.4 338.4 0.12 0.30 0.98 0.35 0.48
And 136.0 306.0 170.0 0.18 0.35 1.34 0.44 0.61
And 438.0 474.4 36.4 0.14 0.62 0.99 0.60 0.82
KLI-22-043 9.0 516.0 507.0 0.17 0.19 0.82 0.32 0.44
Includes 147.0 261.0 114.0 0.28 0.36 1.52 0.55 0.76
And 165.0 229.0 64.0 0.31 0.47 1.82 0.67 0.92
Includes 463.0 501.0 38.0 0.45 0.26 0.83 0.65 0.89
KLI-22-044 11.6 651.0 639.4 0.11 0.23 0.84 0.29 0.39
Includes 81.5 432.2 350.7 0.13 0.32 0.98 0.38 0.52
And 134.0 352.0 218.0 0.15 0.37 1.15 0.43 0.59
And 136.0 194.0 58.0 0.25 0.38 1.73 0.54 0.74
And 237.3 336.7 99.4 0.13 0.47 1.01 0.48 0.66
KLI-22-045 112.0 184.0 72.0 0.21 0.59 1.96 0.66 0.91
Includes 141.0 184.0 43.0 0.17 0.57 2.39 0.61 0.83
And 330.0 367.0 37.0 0.15 0.34 0.89 0.40 0.55
KLI-22-046 273.0 442.0 169.0 0.20 0.46 1.65 0.55 0.75
Includes 313.0 336.2 23.2 0.15 0.49 1.36 0.51 0.71
And 371.0 430.0 59.0 0.24 0.87 2.29 0.89 1.22
KLI-22-047 332.0 385.0 53.0 0.10 0.11 0.72 0.18 0.25
KLI-22-048a 352.0 362.0 10.0 0.01 0.59 1.81 0.46 0.63
KLI-22-049 144.0 484.0 340.0 0.15 0.20 0.80 0.30 0.41
Includes 250.0 316.0 66.0 0.23 0.24 0.90 0.41 0.57
And 456.0 484.0 28.0 0.27 0.44 2.87 0.61 0.84
KLI-22-050 58.0 584.0 526.0 0.20 0.43 1.03 0.52 0.71
Includes 115.0 443.0 328.0 0.25 0.57 1.25 0.67 0.92
And 254.0 308.0 54.0 0.40 1.03 2.42 1.17 1.60
And 354.0 443.0 89.0 0.28 1.05 1.20 1.06 1.45
And 514.0 562.0 48.0 0.19 0.41 1.15 0.49 0.68

*CuEq = ((Cu%) x $Cu x 22.0462) + (Au(g/t) x $Au x 0.032151) + (Ag(g/t) x $Ag X 0.032151)) / ($Cu x 22.0462)
**AuEq = ((Cu%) x $Cu x 22.0462) + (Au(g/t) x $Au x 0.032151)) + (Ag(g/t) x $Ag X 0.032151)) / ($Au x 0.032151)
Commodity prices: $Cu = US$3.50/lb, $Au = US$1,750/oz., and Ag = US$20.00/oz.
Factors: 22.0462 = Cu% to lbs per tonne, 0.032151 = Au g/t to troy oz per tonne, and 0.032151 = Ag g/t to troy oz per tonne.
Recovery is assumed to be 100% - there has been no metallurgical testing on Kliyul mineralization

About Pacific Ridge

Our goal is to become British Columbia's leading copper-gold exploration company. Pacific Ridge's flagship project is its 100% owned Kliyul copper-gold project, located in the Quesnel Trough close to existing infrastructure. In addition to Kliyul, the Company's project portfolio includes the RDP copper-gold project (optioned to Antofagasta Minerals S.A.), the Chuchi copper-gold project, the Onjo copper-gold project, and the Redton copper-gold project, all located in British Columbia. Pacific Ridge would like to acknowledge that its B.C. projects are located in the traditional, ancestral and unceded territories of the Gitxsan Nation, McLeod Lake Indian Band, Nak'azdli Whut'en, Takla Nation, and Tsay Keh Dene Nation.

On behalf of the Board of Directors,

"Blaine Monaghan"

Blaine Monaghan
President & CEO
Pacific Ridge Exploration Ltd.

Corporate Contact:
Blaine Monaghan
President & CEO
Tel: (604) 687-4951
www.pacificridgeexploration.com
https://www.linkedin.com/company/pacific-ridge-exploration-ltd-pex-
https://twitter.com/PacRidge_PEX

Investor Contact:
G2 Consultants Corp.
Telephone: +1 778-678-9050
Email: ir@pacificridgeexploration.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

The technical information contained within this News Release has been reviewed and approved by Gerald G. Carlson, Ph.D., P.Eng., Executive Chairman of Pacific Ridge and Qualified Person as defined by National Instrument 43-101 policy.

Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, which address exploration drilling and other activities and events or developments that Pacific Ridge Exploration Ltd. ("Pacific Ridge") expects to occur, are forward-looking statements. Forward-looking statements in this news release include the planned 7,000 m drill program at Kliyul budgeted at $4.6M, the potential for the KMZ mineralized body to continue growing, and the potential to define a significant porphyry copper-gold system with multiple centres. Although Pacific Ridge believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploration successes, and continued availability of capital and financing and general economic, market or business conditions. These statements are based on a number of assumptions including, among other things, assumptions regarding general business and economic conditions, that one of the options will be exercised, the ability of Pacific Ridge and other parties to satisfy stock exchange and other regulatory requirements in a timely manner, the availability of financing for Pacific Ridge's proposed programs on reasonable terms, and the ability of third party service providers to deliver services in a timely manner. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Pacific Ridge does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/167413