Barton Gold Holdings is pleased to confirm that 5,064m RC drilling metres have been completed at the Tunkillia Gold Project. Tunkillia A223 long section showing pit design in stages, March 2024 MRE & key targets 1 During the past 6 months, Barton has grown Tunkillia to a 1.5Moz Au JORC MRE and published an Initial Scoping Study for ~130kozpa gold production with an all-in sustaining cost of ~A$1,917/oz Au, a 40% equity
[...]