Nachrichten, englisch zu InZinc Mining Ltd.
-
04.11.
InZinc Intersects Exceptional Grades of 20.1% Zn, 1.7% Pb, 9.5 g/t Ag over 3.2 m in Step-Out Drill Hole Located 300 m North of B-9 Zone
-
21.10.
InZinc Accelerates Analysis of Core from Phase 2 Drilling Located 300 m North of B-9 Zone at Indy Project, Central BC
-
09.09.
InZinc Announces Phase 2 Drill Program to Explore for Further Extensions of 700 m Trend of Near Surface Mineralization at Indy Sedex Project, Central BC
-
04.09.
InZinc Reports Additional Results from Drilling Further Expanding Sedex Mineralization at Indy Project, Central BC
-
21.08.
InZinc Intersects 19.1 m grading 3.3% Zn, 0.7% Pb and 7.4 g/t Ag from 30 m downhole
-
18.08.
InZinc Intersects 11.0% Zn, 2.3% Pb and 27.1 g/t Ag over 3.0 m within a 40% Extension of Sedex Mineralized Trend at Indy Project, Central BC





